How a fitout actually runs
Seven stages, in order, with what each one depends on, because the stage everyone underestimates is the one before construction starts.
Concept to handover
The construction weeks are the predictable part. Everything in front of them is where programs are won and lost.
Start a projectSite and lease assessment
Before anything is signed. Can the tenancy physically take your practice? Floor loading, ceiling height, services capacity, an accessible path of travel, room for the plant? Is it a warm shell or a cold shell? Does the use change trigger a development application?
This is the cheapest stage to walk away at, and the most expensive one to skip.
Test fit and budget
A concept plan showing whether the rooms you need fit the space you are considering, with an order-of-magnitude cost against it. Enough to negotiate a lease with, and enough to compare two tenancies honestly.
Equipment schedule
Chairs, imaging, autoclaves, plant. Every one carries power, water, drainage, suction, shielding, floor loading and servicing clearances, and every one of those has to be known before services are set out.
Documenting a clinical fitout before the equipment is chosen is the most expensive sequencing error in this sector, and it is very common.
Design and documentation
Developed design, then the drawings and specifications a builder can price and a certifier can assess. Consultants come in here as required: mechanical, hydraulic, acoustic, access, radiation shielding.
Approvals
Development application where the use is changing, then a construction certificate or the equivalent in your state, plus landlord approval of the fitout under the lease. Council timeframes vary more than any other part of the program.
This is the stage that moves opening dates. Any date quoted without reference to it’s a guess.
Construction
Demolition, services rough-in, partitions, ceilings, joinery, finishes, fit-off and commissioning. Weeks rather than months for a typical suburban clinic, staged if the practice is staying open.
Handover and defects
Occupation certificate, equipment installation and commissioning, operation and maintenance manuals, and a defects period during which the things that only show up in use get fixed.
For how long each of these actually takes, and which two things most often add weeks to a program, read how long a practice fitout takes. If you have not signed a lease yet, the clinic lease checklist is the better place to start, and how to choose a fitout company covers what to ask before anybody quotes.
Keep reading
Send us the floor plan
A site assessment tells you what the tenancy can take and what it will cost to get there, ideally before you have signed for it.